RESEARCH ON THE INTEGRATED TECHNIQUE OF CUTTING OFF COLUMNS AND JACKING OF BUILDING OR STRUCTURE
-
摘要: 通过对建(构)筑物断柱顶升成套技术的总结,包括几种托换顶升平台及其比较分析,说明钢混组合结构顶升平台是一种比较优的托换系统。介绍同步顶升及支撑系统、顶升施工控制及需要解决的问题等,最后介绍工程应用实例及应用效果。Abstract: This paper introduces the integrated technique of cutting off columns and jacking of building or structure,in which several underpinning jacking platform structures and their comparative analysis is described to show that the steel-concrete composite structure being a more superior underpinning jacking platform system.It also introduces the systems of synchronized jacking and support,the control of jacking construction and the problems needed to be solved etc;finally,an example of the engineering application and its application effect are introduced.
-