STRUCTURAL DESIGN AND CONSTRUCTION OF NATATORIUM WITH DOUBLE-FLOOR SWIMMING POOLS IN HARBIN INSTITUTE OF TECHNOLOGY
-
摘要: 根据哈尔滨工业大学游泳馆叠层游泳池的设置情况,给出承托该游泳馆比赛池的预应力框架的裂缝及变形控制标准,详细介绍预应力框架梁、框架柱中预应力筋及非预应力筋的选配过程及为避免框架梁和框架柱中受力筋撞头顶牛、同时确保局压及节点安全而采取的布筋方式及张锚措施。提出预应力框架柱中预应力筋的锚固方法,给出了预应力框架梁、框架柱孔道灌浆方法及灌浆料的选用原则。Abstract: According to the condition of the natatorium with double-floor swimming pools in Harbin Institute of Technology,the standards for controlling crack and deformation of prestressed frame supporting the match pool is given.The process of arranging prestressing reinforcements and non-prestressed reinforcements in frame beam and frame column is introduced in detail.In order to avoid colliding of reinforcements in frame beam and frame column and ensure the safety of local compression and joint,the distribution of reinforcements and the measures for tension and anchorage are highlighted.Anchorage technique for prestressing reinforcements in frame column is presented.The principle of grouting and selecting of grout for frame beam and frame column are given.
-
Key words:
- prestressed beam /
- prestressed column /
- crack control /
- deformation control /
- anchor plate
-
[2] GB 500102002混凝土结构设计规范[S]. GB 500112001建筑抗震设计规范[S]. [3] 《部分预应力混凝土结构设计建议》编写组.部分预应力混凝土结构设计建议[M].北京:中国铁道出版社,1985:10. [4] ACI Committee 318.Building code requirements for structural concreteand commentary(ACI 318M-05)[S].American Concrete Institute,Detroit,2005. [5] 郑文忠,王英.预应力混凝土房屋结构设计统一方法与实例[M].哈尔滨:黑龙江科学技术出版社,1998:149-150. [6] 张昊宇,郑文忠.对用名义拉应力控制预应力混凝土受弯构件裂缝宽度方法的两点改进[J].铁道科学与工程学报,2006,3(6):25-30. [7] JGJ 140-2004预应力混凝土结构抗震设计规程[S]. [8] 郑文忠,解恒燕.预应力混凝土结构设计中应注意的若干问题[J].建筑结构,2007,37(6):97-98,107. [9] 张博一,郑文忠,王英.组合框架梁中两种内置预应力钢桁架的对比分析[J].钢结构,2007,22(8):60-63.
点击查看大图
计量
- 文章访问数: 96
- HTML全文浏览量: 8
- PDF下载量: 126
- 被引次数: 0