A NEW TYPE OF CONNECTION FOR ASSEMBLING CONCRETE FRAME:STUDY ON PRESTRESSED ASSEMBLING FRAME STRUCTURES CONSTRUCTION
-
摘要: 基于国内外对预制装配混凝土结构的节点和框架整体抗震性能的研究,并结合前期对装配混凝土框架结构的新型连接形式预应力装配框架所做的试验和分析,提出了预制装配混凝土结构在今后实际工程中的发展趋势和研究方向。Abstract: Based on the research on the joints and whole frame seismic performances of precast comcrete structures both at home and abroad,and combined with the test and analyses of new type of connection of concrete frame structuresprestressed assembling frame,then it is proposed that the developing trend and study direction of actual projects of precast concrete structures in future
-
Key words:
- precast concrete /
- frame /
- seismic performances /
-
[2] Iverson,James K,NeilM Hawkins.Performance of Precast/PrestressedConcrete Building Structures during Northridge Earthquake[J].PCIJouranal,1994(2):38-55. Morris A E J.Precast Concrete in Architecture[M].London:GeorgeGodwin Limited,1978. [3] Priestley.M JNige.l Overview ofPRESSS ResearchProgram[J].PCIJournal,1991(4):50-57. [4] Loo Y C,Yao B Z.Static and Repeated Load Tests on PrecastConcrete Beam-to-Column Connections[J].PCI Journal,1995(2):106-115. [5] CECS 52:93整体预应力装配式板柱建筑技术规程[S]. [6] 赵斌,刘学剑,吕西林.柔性节点预制混凝土结构的动力反应[J].同济大学学报:自然科学版,2005,33(6):716-721. [7] 刘炳康,张瑜中,晋哲锋,等.预压装配式预应力混凝土框架接合部抗震性能试验研究[J].建筑结构学报,2005,6(2):60-65. [8] Ertas,Onur,Sevket Ozden,et al.Ductile Connections in PrecastConcrete Moment Resisting Frames[J].PCI Journal,2006(3):66-76. [9] 董挺峰,李振宝.无粘结预应力装配式框架内节点抗震性能研究[J].北京工业大学学报,2006,32(2):144-148. [10] 李振宝,董挺峰.混合连接装配式框架内节点抗震性能研究[J].北京工业大学学报,2006,32(10):895-900. [11] 王冬雁,李振宝.无粘结预应力装配结构加固试验研究[J].工程抗震与加固改造,2007,29(6):78-81.
点击查看大图
计量
- 文章访问数: 78
- HTML全文浏览量: 6
- PDF下载量: 73
- 被引次数: 0