APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN BEIJING CHILDREN'S NEW PALACE
-
摘要: 介绍了北京市新少年宫1号楼异形板柱剪力墙结构中缓粘结预应力筋设计方法;按照空心板的主受力方向并考虑施工方便,确定出空心管的布置方向以及普通筋和预应力筋布置方向;用密肋梁模拟了空心板的受力,并用密肋梁的内力计算结果确定了顺肋方向的配筋;根据结构抗震性特点,在抗震敏感区域采用缓粘结预应力技术来提高结构的抗震性能。Abstract: The design method of retard-bonded prestressing bar is introduced in No.1 building of Beijing Children's New Palace,which is an irregular slab-column and shear wall structure.The direction of cored pipe as well as reinforcing and prestressing bars are decided based on the primary internal force direction of solid shell and a convenient construction is also taken into account.The internal force of cored slab is simulated with multi-ribbed plate,and the reinforcement along rib is calculated based on the results of multi-ribbed plate.The retard-bonded prestressing technique is applied to the earthquake sensitive area to improve the earthquake resistance ability of the structure
-
Key words:
- retard-bonded /
- prestressed concrete /
- cored slab /
- irregular slab
-
于慧敏,王中筑,贾希君,等.缓粘结预应力混凝土技术在天津力神力池扩建项目中的应用.预应力技术,2007(5) [2] 派克R,根勃尔W L.钢筋混凝土板.黄国桢,成源华,译.上海:同济大学出版社,1992:112-127 [3] JGJ/T 92-93 无粘结预应力混凝土结构技术规程 [4] 赵建昌,王起才.缓粘结预应力混凝土结构试验研究.铁道学报,2002(4) [5] 刘文华,刘立军,朱龙,等.缓粘结预应力钢绞线的试验研究.建筑技术,2003,34(12):917-918 [6] 曾昭波.缓粘结预应力体系力学性能的试验研究:[学位论文].北京:中冶集团建筑研究总院,2005
点击查看大图
计量
- 文章访问数: 83
- HTML全文浏览量: 10
- PDF下载量: 36
- 被引次数: 0