STUDY ON PREPARATION TECHNICS AND PRODUCING EQUIPMENT OF RETARD-BONDED PRESTRESSING STRAND
-
摘要: 依据缓凝胶粘剂材料的特性,对其制备工艺进行了深入研究,提出在制备过程中存在的各影响因素的解决方法,并对制备过程的环境控制加以说明。同时,研制出适用于加工缓粘结预应力钢筋的涂层设备、冷却设备和压纹设备,为缓粘结预应力钢筋的生产提供了设备保证。Abstract: It is studied the preparation technics deeply based on the performance characters of adhesive materials,then put forward the solution to every influencing factor during the preparation process,and described the environment control of preparation process.At the same time,it is also developed the coating system equipment,the cooling equipment and the scratch equipment suitable for the processing of retard-bonded prestressing strand,which provides the equipment guarantee to the production of retard-bonded prestressing strand.
-
Key words:
- retard-bonded /
- adhesive /
- preparation technics /
- influencing factors /
- producing equipment
-
李佩勋,尚仁杰,吴转琴,等.缓粘结预应力筋:中国,ZL02240778.2.2003-07-30 [2] 吴转琴,尚仁杰,范蕴蕴,等.一种缓粘结预应力筋用胶粘剂:中国,ZL2005.1.0132504.X.2007-03-04 [3] 程时远,李盛彪,黄世强.胶粘剂.北京:化学工业出版社,2001:22-26 [4] 赵福君,王超.高性能胶粘剂.北京:化学工业出版社,2006:14-15 [5] 贺曼罗.环氧树脂胶粘剂.北京:中国石化出版社,2004:291-295 [6] 陶学康.无粘结预应力混凝土设计与施工.北京:地震出版社,1993:165-167 [7] 刘瑞霞.塑料挤出成型.北京:化学工业出版社,2005:102-104 期刊类型引用(3)
1. 顾辉祥,白羽,许进飞. 玄武岩纤维布加固木柱轴压性能试验研究与有限元分析. 新型建筑材料. 2023(05): 42-47 . 百度学术
2. 侯玉岭,赵庆双. 古建筑木结构的木柱加固技术研究综述. 四川水泥. 2021(06): 240-241 . 百度学术
3. 宋娜娜. 压水堆核电站压力容器用材料性能的试验研究. 化工机械. 2019(04): 375-377 . 百度学术
其他类型引用(6)
-