DESIGN OF TWO TYPICAL POST-BUILT SUSPENDED STAIRCASES
-
摘要: 提出通过垂直于外套框架梁后置悬挂梁,在后置悬挂梁上设置竖向吊杆,以吊杆作为楼梯的竖向承重构件,来后置连接原建筑顶层地面至新增套建一层顶楼梯的设计思路和方法。应用这一思路和方法实现了绥芬河青云市场原建筑与新增套建增层楼层竖向交通的连续。Abstract: The design and method of staircase between the roof of the original building and the second floor of the new added building are presented, that is: put up pos-t built suspended beams perpendicular to the ou-t jacketing frame beams, and then build hanger rods from them, which makes hanger rods vertical load-carrying elements and support the staircase. The staircase linking the original building and the new added floor in Suifenhe Qingyun Market is constructed in this way.
-
谭 军. 绥芬河青云市场套(扩) 建工程设计方法与施工措施研究: [硕士学位论文]. 哈尔滨: 哈尔滨工业大学, 2005: 68-76 [2] GB 50010-2002 混凝土结构设计规范 [3] CECS 25: 90 混凝土结构加固技术规程 [4] 万墨林, 韩继云. 混凝土结构加固技术. 北京: 中国建筑工业出版社, 1991: 45-55