DEVIATION-RECTIFYING AND STRENGTHENING OF COLUMNS FOR AMILL BULLDING
-
摘要: 对某厂房在设备基坑开挖过程中,由于开挖不当,造成基础桩、承台和柱发生偏移的问题,分析了事故原因,着重对该工程混凝土柱纠偏加固技术进行了论述。Abstract: The sways of foundation piles, cushion caps and columns occurred due to unsuitable excavation of equipment foundations for a mill builging. The causes were analyzed. It was described emphatically the deviation-rectifying and strengthening technologies of the concrete columns for the mill building.
-
Key words:
- deviation-rectifying /
- steel plate encasement /
- translation /
- monitoring
-
[2] GB 50010-2002 混凝土结构设计规范 DGJ 32PJ57-2007 建(构) 筑物整体迁移技术规程 [3] GB 50367-2006 混凝土结构加固设计规范
点击查看大图
计量
- 文章访问数: 75
- HTML全文浏览量: 11
- PDF下载量: 81
- 被引次数: 0