DEVIATION-RECTIFYING AND STRENGTHENING OF COLUMNS FOR AMILL BULLDING
-
摘要: 对某厂房在设备基坑开挖过程中,由于开挖不当,造成基础桩、承台和柱发生偏移的问题,分析了事故原因,着重对该工程混凝土柱纠偏加固技术进行了论述。Abstract: The sways of foundation piles, cushion caps and columns occurred due to unsuitable excavation of equipment foundations for a mill builging. The causes were analyzed. It was described emphatically the deviation-rectifying and strengthening technologies of the concrete columns for the mill building.
-
Key words:
- deviation-rectifying /
- steel plate encasement /
- translation /
- monitoring
-