PRE-SET CONSTRUCTION DEFORMATION VALUE AND ITS COMPUTATIONAL METHODS FOR STEEL STRUCTURES
-
摘要: 一般情况下钢结构的设计位形只是施工的目标位形,不能作为确定构件加工和安装位形的直接依据。为保证施工的顺利进行以及竣工时结构的位形满足设计要求,施工过程中需对结构设置变形预调值。介绍了钢结构施工变形预调值的概念,构造了钢结构施工变形预调值计算的一般迭代法、正装迭代法、倒拆迭代法和分阶段综合迭代法。其中,一般迭代法可用来计算采用满堂脚手架法施工的钢结构变形预调值。正装迭代法可用来计算各种施工方法下钢结构的变形预调值,但当结构复杂杆件比较多时,分析过程中常出现算法不收敛的问题。倒拆迭代法收敛性高,但计算工作量较大。分阶段综合迭代法可以用来计算闭环复杂结构的变形预调值,克服迭代不收敛问题,其计算工作量较小。Abstract: If the structural members are fabricated and erected according to the structural design configuration (SDC)during the construction process of steel structures, it may lead to a considerable deviation between the structuralconstruction completed configuration and the SDC. Therefore it is necessary to take pre-set deformation values (PDV) forthe structural members during the construction process. It will be focused on three computational procedures for determiningpre-set deformation values of the structural members, namely, forward iteration method, backward iteration method andstepped comprehensive iteration method. Their advantages and disadvantages are pointed out where different constructionapproaches are employed. Numerical studies and engineering applications are given for different structural forms.
-
.项海帆.高等桥梁结构理论.北京:人民交通出版社,2001 .向中富.桥梁施工控制技术.北京:人民交通出版社,2001 .钱若军,杨联萍.张力结构的分析设计施工.南京:东南大学出版社,2003 .张晓燕,郭彦林,黄李骥,等.深圳会展中心钢结构屋盖起拱方案及施工技术.工业建筑,2004,34(12):15-18 .郭彦林,邓科,王宏,等.广州新白云国际机场维修机库钢屋盖整体提升技术.工业建筑,2004,34(12):6-11 .鲍广鉴,郭彦林,李国荣,等.广州新白云机场主航站楼钢结构整体曲线滑移施工技术.建筑结构学报,2002,23(5):90-96 .郭彦林,缪友武,娄俊杰,等.澳门综合体育馆主桁架整体提升及提升塔架分析.建筑结构学报,2005,26(1):17-24 .郭彦林,刘学武,刘禄宇,等.CCTV新台址主楼钢结构施工变形预调值计算的分阶段综合迭代法.工业建筑,2007,37(9):16-21
点击查看大图
计量
- 文章访问数: 75
- HTML全文浏览量: 5
- PDF下载量: 61
- 被引次数: 0