LIFTING AND RECTIFYING DESIGN OF COALMINE TRANSSHIPMENT GALLERY
-
摘要: 首次应用数值模拟方法对煤矿栈桥发生较大量下沉、倾斜问题进行建筑病害分析,提出柱基下预压托换桩和斜撑架断柱相结合的综合顶升纠倾法治理方案。结合结构性能分析,给出顶升纠倾的转动轴位置、柱体断口位置、加载点布置、加载及位移控制量确定的设计要点,并用数值模拟方法予以验证,使后续施工达到预期目的。Abstract: Based on analyzing the reason of the settlement and slope of transshipment gallery in coalmine, numerical simulation was firstly used in analyzing the damage of the building and comprehensive uplifting underpinned piles under column foundation and intercepting brace columns. With analyzing structural function, rotating axis, the intercepting position of column, loading point layout and the decision of load and displacement value were stated. Numerical simulation method was used to prove it. Expected targets were achieved in post construction and good effect of treating the specific structure was obtained.
-
[2] Save M A,Massonnet C E.Plastic Analysis and Design of Plates,Shells and Disks,North-Holland Publishing CoMPany,1972:35-42 李云鹏,王芝银.固体力学有限单元法及程序设计.西安:西安地图出版社,1994:3-4 [3] GB 50025-2004 湿陷性黄土地区建筑规范 [4] 赵来顺,陈国政.钢筋混凝土预压桩设计浅析.西安科技学院学报,1999,19(增刊):95-99 [5] 赵来顺,唐丽云,石玉生,等.整体顶升法在栈桥走廊下沉处理中的应用.西安科技学院学报,2004,24(1):34-37
点击查看大图
计量
- 文章访问数: 62
- HTML全文浏览量: 5
- PDF下载量: 80
- 被引次数: 0