DIFFERENT MEASURE METHODS USED TOGETHER FOR ONE HIGH-RISE BUILDING
-
摘要: 当工程各区不通轴时,整个工程转角复杂,定位放线采用轴线控制法需多次迁站,会导致测量误差快速积累,采用极坐标法会更为方便。对0.000以下竖向控制采用外控法,0.000以上采用内控法能有效地控制轴线。将标高逐层传递,联测外方向控制楼体扭转。不同测量方法有效组合,在高层建筑工程测量中能起到很好的效果。同时对沉降观测的实施方法给予介绍。Abstract: When the sections of a project are not in the through going shaft, the project's rotational angle is complicated. Axes controlling method for line setting need to move station many times and measuring error will accumulate rapidly. Polar coordinates method is more convenient. Outer controlling method is used for upright control under 0.000 and inner controlling method for above 0.000, thus the axes are controlled effectively. Elevations pass layer-by-layer, outer direction joint measuring can control the building rotation. The combination of different measuring methods can make good effect during tall building measuring. And the implementing method for settlement observation is also expounded.
-
Key words:
- techniques /
-
GB 50026-93 工程测量规范. JGJ T 8-97 建筑变形测量规程
点击查看大图
计量
- 文章访问数: 65
- HTML全文浏览量: 4
- PDF下载量: 91
- 被引次数: 0