ANALYSIS AND DESIGN OF THE CRANE INSTALLED ON TOP OF THE EXISTING FRAMEWORK BUILDING
-
摘要: 将塔吊安装于既有框架建筑顶部,在塔吊底部设计钢梁承担重力荷载;塔身与原屋盖梁板连接,主要承担倾覆力矩。通过力学方法详细计算分析出钢梁内力情况并进行钢梁设计,同时做好钢梁与框架柱的连接措施,对原建筑的影响亦需验算。Abstract: If a tower crane is located at the top of a frame structure,the steel beams will be installed under the crane to undertake its weight.The body of the crane shall be connected with the original beams and slabs of the roof.The overturning moment of the crane will be counteracted.The internal force of the steel beams will be analyzed by exact mechanical method.By the results the correct type of steel beams will be chosen.At the same time the correct connection between the framework columns and the steel becuns will be ensured.Furthermore,the influence of this crane on the original building is also considered and calculated.
-
Key words:
- gravity /
- overturning moment /
- revolving /
- rigid frame /
- steel beam
-
[2] 《建筑结构静力计算手册》编写组.建筑结构静力计算手册.第二版.北京:中国建筑工业出版社,1998 GB 50017-2003 钢结构设计规范 [3] 《轻型钢结构设计指南(实例与图集)》编辑委员会.轻型钢结构设计指南.北京:中国建筑工业出版社,2000
点击查看大图
计量
- 文章访问数: 73
- HTML全文浏览量: 6
- PDF下载量: 107
- 被引次数: 0