DISCUSSION ON PLACEMENT AND CLOSURE TIME OF POST-POURED STRIPS OF CONCRETE FLOOR STRUCTURES
-
摘要: 在混凝土楼盖结构中,通过设置后浇带,释放混凝土的大部分收缩变形。后浇带的留设间距与支承结构的刚度、混凝土的收缩量和后浇带的封闭时间有关。后浇带封闭时间越晚、贯穿后浇带的钢筋面积越少,后浇带宽度越大,后浇带处钢筋的约束拉力就越小,有利于发挥后浇带的作用,增强抗裂效果。Abstract: Post-poured strips are often placed to release most of the shrinkage strain for concrete floor structures.The distance between post-poured strips depends on stiffness of supporting structures,shrinkage value and closure time.The later is the closure time,the smaller is the continuous bar area and the greater the width is,the smaller the restraining tensile force in bars of post-poured strip will be.It is advantageous to realize the function of post-poured strip and strengthen its crack resistance.
-
Key words:
- post-poured strip /
- computational temperature difference /
- crack /
- shrinkage /
- thermal stress
-
王铁梦. 工程结构裂缝控制. 北京: 中国建筑工业出版社, 1997: 29-32 李富民, 孟少平. 钢筋混凝土框架结构收缩缝间距计算. 中国矿业 大学学报,2005, 34(3): 274-277 全学友, 孙会郎. 后浇带的设置方案对抗裂效果的影响. 建筑结 构,2004, 34(6): 22-24 过镇海, 时旭东. 钢筋混凝土原理和分析. 北京: 清华大学出版社, 2003: 53-64
点击查看大图
计量
- 文章访问数: 70
- HTML全文浏览量: 17
- PDF下载量: 149
- 被引次数: 0