THE STRENGTHENING METHOD AND PROJECT PRACTICE OF FAILURE CONCRETE FOUNDATION
-
摘要: 结合某工程实践,通过采用桩土共同作用的复合地基托换技术,充分地利用原有基础的承载能力,很好地解决了因混凝土失效引起的基础承载力不足。最后,给出了典型算例供工程技术人员参考。Abstract: According to a project practice, by using the composite foundation underpinning technology, as well as considering pile-soil interaction, the problem of foundation capacity scarcity because of the failure of concrete has been solved. The original foundation has been taken into account sufficiently. In the end, a typical project example is also provided for engineers and technicians reference.
-