PREDICTION AND ANALYSIS OF DEFORMATION OF DEEP EXCAVATION
-
摘要: 由于基坑工程的复杂性,很难从理论上对围护结构水平位移和周围地表沉降进行预测,故在基坑开挖过程中信息化施工就显得特别重要。采用改进的BP算法对深基坑围护结构变形进行预测的方法,与传统的BP算法相比,该算法具有更快的收敛速度,能有效地改善传统BP算法收敛慢的缺点。通过对预测结果与实测结果进行对比分析,表明改进的BP网络是预测基坑围护结构变形的一种十分有效的方法。最后分析了基坑周围地表沉降与围护结构变形之间的关系。Abstract: Because of the complexity of excavation engineering, it is very difficult to predict the displacement of retaining structure and the settlement of ground surface, and information construction is very important for an excavation engineering.A method for predicting displacement of retaining structure based on modified BP algorithm is used. The modified algorithm has higher convergence rate and thus improves the conventional one effectively. It is proved that prediction results agree with the measured ones very well, so displacement prediction by the modified BP algorithm is practicable. Finally, the relation between the displacement of retaining structure and the settlement of ground surface is analyzed.
-
Key words:
- modified BP algorithm /
- deep excavation /
- deformation prediction /
- retaining structure
-
应宏伟,王奎华,谢康和,等.杭州解百商业城半逆作法深基坑支护设计与监测.岩土工程学报,2001,23(1):79~83 [2] 尹敬译,夏振军,邓万福.广东省工商银行业务大楼深基坑施工技术.岩石力学与工程学报,2002,21(6):910~914 [3] Rajasekaran S,Febin M,F,Ramasamy J V.Artificial Fuzzy Neural Net works in Civil Engineering.Computers Structures,1996,61(2):291~302 [4] In-Mo Lee,Jeong-Hark Lee.Prediction of Pile Bearing Capacity Using Artificial Neural Networks.Computers and Geotechnics,1996,18(3):189~200 [5] 朱合华,刘学增,叶冠林.防汛墙变形动态预测方法的研究.土木工程学报,20 01,34(6):63~66 [6] 李庆来.人工神经网络与概率方法在深基开挖信息施工中的应用.土木工程学报 ,2001,34(2):96~100 [7] 杨建刚.人工神经网络实用教程.杭州:浙江大学出版社,2002 [8] 侯学渊,陈永福.深基坑开挖引起周围地基土沉陷的计算.岩土工程师,1989,1 (1):3~13 [9] 刘建航.地下墙深基坑周围地层移动的预测与治理之二--基坑周围地层移动的预测.地下工程与隧道,1993(2):2~15
点击查看大图
计量
- 文章访问数: 108
- HTML全文浏览量: 26
- PDF下载量: 110
- 被引次数: 0