DESIGN OF REMOVING COLUMNS FOR HAITIAN BUILDING IN BEI'AN CITY
-
摘要: 北安市海天大厦原设计为5层框架,在建至第2层时决定改变顶层使用功能,须将顶层若干根内柱抽掉。着重介绍了抽柱设计的思想,抽柱后对预应力框架进行的计算,原设计基础及柱的验算、补强等内容,可供类似工程改造设计时参考。Abstract: The original design of Haitian Building in Beian is a five-story frame building .When the second story was being constructed, the function of the top story needs to be changed and several columns of the top story need to be removed .It is introduced that the design idea of removing columns, design of the prestressed concrete frame after removing columns,checking and strengthening of relative columns and relative single-foundations in the original design .It can serve as reference in modifying the design of homogeneous structures.
-
Key words:
- removing column /
- prestress /
- column reinforcement /
- foundation reinforcement
-
[2] 杜拱辰.现代预应力混凝土结构.北京:中国建筑工业出版社,1988 郑文忠, 王英.预应力混凝土房屋结构设计统一方法与实例.哈尔滨:黑龙江科学技术出版社, 1998 [3] JGJ T 92-93 无粘结预应力混凝土结构技术规程 [4] GB 50010-2002 混凝土结构设计规范 [5] GB 50007-2002 建筑地基基础设计规范
点击查看大图
计量
- 文章访问数: 134
- HTML全文浏览量: 9
- PDF下载量: 90
- 被引次数: 0