ANALYSIS AND TREATMENT OF A LOCAL SLIDING ACCIDENT OF NO.3 RETAINING WALL OF A PROJECT
-
摘要: 结合鞍钢新1号高炉改造工程3号挡土墙局部滑移事故处理工程实际,提出并采用人工挖孔桩抗滑移加固处理方案,经实施证明,该方案简单、可靠,并为今后类似工程提供参考。Abstract: Combining the treatment of a sliding accident of No.3 retaining wall of No.1 blast furnace project for Angang Group, a strengthening method using man dug cast in place pile is introduced. It is proved that this scheme is convenient and reliable, which provides a reference for similar projects.
-
Key words:
- gravity retaining wall /
- anchor pile /
- slip /
- cast-in-place pile
-
GB50007-2002建筑地基基础设计规范 [2] JGJ79-91建筑地基处理技术规范 [3] JGJ94-94建筑桩基设计规范 [4] 地基处理手册编写委员会.地基处理手册.北京:中国建筑工业出版社, 1992